Leeden Limited



Corporate Highlights

Leeden Opens Lianyungang Henglong Waste Water Treatment Plant in China 29th June 2010

On 17 May 2010, Leeden Limited’s associated company, Lianyungang Henglong Water Co.’s (Henglong Water) Waste Water Treatment Plant (WWTP) was officially opened at Lianyungang City, Jiangsu Province, China.

Lianyungang Henglong Water Co. wore a festive look during its official opening ceremony

Lianyungang Henglong Water Co. wore a festive look during its official opening ceremony.

Henglong Water commenced construction of this prestigious project in Lianyungang Economic Technological Development Zone (LYG ETDZ) in June 2007 with a planned capacity to treat 100,000 m³/d of waste water. The Phase I of the project, with a treatment capacity of 48,000 m³/d, was completed and commissioned in May 2009 with a grand official inauguration ceremony on 17 May 2010.

From left: Mr. Kelvin Lee, COO Leeden Limited, Mr. Wei Huai Yu, LYG ETDZ, Mr. Zhang Liu Hai, Director Construction Bureau LYG City, Mr. Yao Xiao Qin, Director Environment Protection Dept, Jiangsu Province, Mr. Dong Chou Gen, Vice Mayor LYG city, Mr. Wang Xiang, Vice Director Construction Dept Jiangsu Province, Mr. Zhou Qian, Director Environmental Protection Jiangsu Province, Mr. Chen Shu Jun, Director of Environmental Protection LYG city, Mr. Steven Tham, CEO Leeden Limited.
From Left: Mr Kelvin Lee (COO, Leeden Limited), Mr Wei Huai Yu (LYG ETDZ), Mr Zhang Liu Hai (Director Environment Protection Dept, Jiangsu Province), Mr Dong Chou Gen (Vice Mayor, LYG city), Mr Wang Xiang (Vice Director, Construction Dept, Jiangsu Province), Mr Chen Shu Jun (Director of Environmental Protection, LYG city), Mr Steven Tham (CEO, Leeden Limited)


Built on a land area covering over 80,000 sqm, the highly automated plant with state-of-the-art German technology is a Built-Operate-Transfer (BOT) contract with an operational period of 30 years. The Biolak® Process Technology chosen for the project is well established and highly effective for treating industrial and domestic waste water. Since its commissioning in May 2009, the treated water results have been consistent, meeting the discharge specifications of local authorities. Besides the modern plant and machinery, Henglong Water also boasts of a fully equipped laboratory with real time testing capability to analyze the treated water quality.

Fully Equipped Laboratory
The state-of-the-art BIOLAK® basins

Fully Equipped Laboratory

The state-of-the-art BIOLAK® basins

Phase II includes expansion of its waste water treatment capacity and addition of a water recycling plant in the near future.


  1. Home
  2. About Us
  3. Our Core Business
  4. Corporate News
  5. Contact Us


  1. Copyright © 2010 Leeden Limited.
  2. All Rights Reserved.
  3. Terms of Use
  4. Web Design by Bionic Creative